Crawl, Walk, Run

| | Comments (0)

Today DOMO mounted its first pin from the sample dewar that was filled with liquid nitrogen.

This video is pretty large so unless you are on a fast connection or have alot of time to waste trust me DOMO is finally crawling.

Leave a comment

ALS Ring Status

loading ...
als current sparkline

Funding

Archives

Powered by Movable Type 5.2.13

March 2017

Sun Mon Tue Wed Thu Fri Sat
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31